Construction of new road and bridge access to Negin Island Bushehr

As planned Negin island could be a place to attract foreign investment in port and maritime scope that can improve economic development for Iran. Connecting Negin Island to special economic zone of Boushehr harbor by constructing an access road with 10k length and a bridge with 190m inside it was included in Boushehr General Directorate of Ports and Maritime schedule and establishing that assigned to Henza company. Location by the sea and have an easy access to Borazjan’s road is one of the most unique advantages of Negin Island.

General specifications and project volumes:

  • Type of contract: Engineering, Procurement, Construction (EPC)
  • Employer: Boushehr General Directorate of Ports and Maritime
  • Consulting Partners: Tadbir Sahel Pars
  • Duration of the contract: 30 months
  • The length of decks of main bridges: 140 m
  • The largest bridge span: 30 meters
  • The roadway width: 10 k
  • The number of piers bridges: 7
  • The area of the bridge deck: 1914 square meters
  • The volume of concrete casting: 88,000 cubic meters

Project information

Project location:
Boushehr
Area:
---
Execution project type:
Road
Project start date:
SUNDAY, 27 JANUARY 2019
Project Finish date:
THURSDAY, 29 JULY 2021